We are now doing installations of solar power Spotcast 2.0 on campus. This installation utilized a bucket truck as one was available, but could have easily been done with a contractor ladder. Spotcast are installed 3-4 meters above ground to provide both wide coverage. Installation was quick, about 10-15 min per post.
|
AuthorGet the inside scoop on what's happening in the Human Network Labs offices. Check back for our latest product developments and much more! Archives
June 2013
Categories |