![Picture](/uploads/1/2/6/8/12683404/2281590.jpg?346)
We are now doing installations of solar power Spotcast 2.0 on campus. This installation utilized a bucket truck as one was available, but could have easily been done with a contractor ladder. Spotcast are installed 3-4 meters above ground to provide both wide coverage. Installation was quick, about 10-15 min per post.